Page 92 - Demo
P. 92


                                    92 APPLICATION & CONSTRUCTION AAC WORLDWIDE %u2022 2.2025APPLICATION & CONSTRUCTIONtion of these supports obstructed the available space for installing other services, limiting the progress of other subcontractors.The construction time has been reduced by 40% after redesigning with Jetway%u2019s professional Ytong solution, which contributed to the flexibility and ease of installation.After considering the project requirements, the main contractor decided to use Ytong slab panels. These panels only required simple scaffolding, allowing workers to install them easily on the platform. Transporting the panels was also straightforward, as a forklift could be used to move the slabs onto the working platform. Utilizing Ytong slab panels significantly accelerated the project%u2019s progress without hindering other subcontractors, making it a fast and reliable solution. %u25cfUtilizing Ytong slab panels significantly accelerated the project%u2019s progress without hindering other subcontractors, making it a fast and reliable solution.Technical info: dead load + design wind pressure + wind pressure by train = 5.3 kPa, under fire situation = 3.5 kPa, FRP: 150 mins.Maximum span length = 2.5 m, bending moment (simply supported) = 4.14 kNm/ m, shear force (simply supported) = 6.63 kN/m, covered area = 8,800 m2.Jetway Building Material Ltd.Unit A, 18/F, Galaxy Factory Building25 Luk Hop StSan Po KongHongkongwww.jetwaybm.com
                                
   86   87   88   89   90   91   92   93   94   95   96