Page 36 - Demo
P. 36


                                    PRODUCTION TECHNOLOGY36 PRODUCTION TECHNOLOGY AAC WORLDWIDE %u2022 3.2025Success through partnershipH+H enhances efficiency of its pump systems at Pollington plant, UKH+H partnered with Atlantic Pumps, an abrasive equipment manufacturer and supplier, to improve the pump systems at its Pollington plant. In response to a recent increase in production demand, H+H conducted an appraisal of its manufacturing process to identify potential bottlenecks in production. This revealed an opportunity to improve the reliability of the pump system.In the manufacture of autoclaved aerated concrete, recycled pulverised fuel ash (PFA) is added to a slurry with lime, cement, sand, and aluminium powder. As many of these ingredients are highly abrasive, a robust and reliable pump system is required to transport the mix around the plant.H+H worked closely with Atlantic Pumps on the design and selection of the new pump system. The upgrade has enhanced the reliability and efficiency of the pumps, and made them easier to maintain.The initiative has resulted in a substantial resource saving, including eradicating the need for water. The original pump system required a significant amount of water to operate, using it as a coolant, sealant, and lubricant.Operation of the pumps now also requires less energy usage, enabling the Pollington plant to scale up its production capacity more sustainably.H+H operators underwent practical onsite training for using and maintaining the pumps. In combination with the new system and ongoing technical support from Atlantic Pumps this has allowed H+H to carry out maintenance repair tasks three times faster than before.Both H+H and Atlantic Pumps are supportive participants of the AMRC apprentice training scheme. The AMRC develops the next generation of engineers through apprenticeships, strengthening engineering skills and sharing best practices across industrial and engineering fields. %u25cfA key participant in the upgrade was Alex Whinfrey-Gibson (in the picture on the left), a Level 6 Engineering Degree Apprentice, working at the Pollington Plant. Last year, Alex completed his Bachelor of Engineering Maintenance degree from The University of Sheffield%u2019s Advanced Manufacturing Research Centre (AMRC) while working at H+H.
                                
   30   31   32   33   34   35   36   37   38   39   40